Repainting of topsides in navy blue color with double waterlines in metallic gray.
- Stripping and subsequent varnishing of all exterior woodwork.
- Dismantling of rudder blade and installation of new bearings.
- Review of the electrical part.
- New teak toe rail.
- Remodeling of a cabin converting a single bed into a double.
- The engine is removed to do a complete service in the workshop and replace it later.
- Conversion from cutter to sloop.